Reference List
|
Refractory Curing - Dry Out
Projects Undertaken
|
| |
| |
Customer |
|
Location
|
|
Project
|
| |
Sicartsa |
|
Mexico |
|
Dry Out To 1200oC 42
m Blast Stove x 4 |
| |
I.M.B
|
|
Italy
|
|
Dry Out To 1052oC
Waste Heat Boiler / manifold |
| |
Glass Technologies
|
|
Beirut
|
|
Dry Out Glass Furnace
To 1400oC |
| |
KCH |
|
Tipton U.K.
|
|
Dry Out Resin 20m Vessel
Electric Blower |
| |
ESB
|
|
Co. Clare Ireland |
|
Refractory dry out Ash
Hopper 24m wall |
| |
Esso |
|
Rotterdam
|
|
Dry Out Flexi - Coker
Using 12 H.V. Gas Sets |
| |
Louisiana Pacific
|
|
Waterford Eire
|
|
Dry Out 2 x Waste
Heat Boilers 800oC |
| |
Glass Technologies
|
|
Barcelona Spain
|
|
Dry Out Glass Furnace
To 1400oC |
| |
Montupay
|
|
Ireland
|
|
Dry Out Aluminium
Furnaces |
| |
Finn - Heat
|
|
Finland
|
|
Dry Out Reactors
950oC |
| |
Ilva |
|
Italy |
|
Dry Out Flexi - Coker
Units |
| |
Ansaldo
|
|
India
|
|
Dry Out 70m Boiler
550°C |
| |
Ansaldo
|
|
India |
|
Dry Out 6 x Resuction
Ducts |
| |
|
|
|
|
|
|
|
|
|
All the above projects were
undertaken using high velocity gas burners, mains units
and conventional heat treatment units with associated
electrical resistance coils, which can be purpose made for
any project.
|
|
|
|
All types of gas can be
used to supply the gas burners, which are rated at 10
million B.T.U. per unit, obviously natural gas is the
ideal candidate because this eliminates the use of
vaporisers, however propane, butane and acetylene are
alternatives or mixtures of the said gases are acceptable.
|
|
|
A typical layout drawing
for pipework installation can be supplied upon request,
bearing in mind that each project is dealt with as an
individual case.
|
|
|
|
Shipping or airfreight can be
arranged for all equipment being utilised for any project to
and from the United Kingdom. |
|
|
|
Site Management
|
|
|
|
Heat Up Of Blast Stoves
Sicartsa Mexico ( 4 visits) |
|
Flexi-Coker Esso Holland (3
major shutdowns 1990, 1993, 1996) |
|
F.C.C. Unit Esso Belgium
|
|
F.C.C. Shutdown B.P. / Mobil
Coryton (February 1996) |
|
Shellhaven Shutdown (6
Companies / February 1995) |
|
Heat Up Pf Blast Stoves Ilva
Taranto Italy |
|
B.P. Grangemouth Reactor Dry
Outs |
|
|
|
Gas Contracts U.K.
|
|
|
|
|
Blythe and Nottingham
(Refractory Dry Out) |
Exxon Petroleum, Fawley (Post
Weld Heat Treatment) |
|
Shell, Stanlow (Post Weld
Heat Treatment) |
B.P.,Grangemouth (Dry Out) |
|
Shellhaven, Essex (Post Weld
Heat Treatment) |
Alcan, Warrington
|
|
Alcan,Lynemouth
|
Alcan, Banbury |
|
Mitsui Babcock, Scotland |
Dunlop, Coventry |
|
|
|
|
Gas Contracts Overseas
|
|
|
|
|
|
Blast Stoves, Sicartsa,
Mexico (Heat Up) |
Saras Refinery, Sardinia
|
|
Blast Stoves, Ilva, Italy
(Heat Up) |
I.M.B., Italy |
|
|
Leesin Engineering, Taiwan
|
|
Mantova, Italy |
Fina, Belgium |
|
Esso, Rotterdam |
Esso, Belgium |
|
20m Spheres, Dubai x 2 (700
Tons) |
42m Vessel, Sweden (360 Tons) |
|
18m Sphere, Oman (400 Tons) |
72m Digester, Indonesia (360
Tons) |
|
Glass Furnace, Beirut |
4 x Vessels, Jeddah Saudi
Arabia (360 Tons) |
|
|
|
|
|