Specialist Heat Treatment Services
 Specialist Pipe Repair Systems
 Specialist Electric Surface Heating
 Specialist Refractory Curing
 Specialist Recruitment Services
 
   
   
 
 
     
  Home
  About Us
Heat Treatment Services
Clock Spring Repair Systems
  Approvals & Benefits
  SHS Approved Installers
  Repair Applications
  Girthweld Repairs
  Installation Certifications
    Installation Procedure
    Clock Spring Snap Wrap
    Clock Spring Pipe Support
    Clock Spring Leak Stop
Recruitment Services

  Client Reference List
  Quality Assurance
  Associated Companies

  Contact Us
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
 
Clock Spring Snap Wrap
 

The Fast, Economical Solution for Low Pressure Pipeline Repair

 
  • Suitable for pipe sizes from ¾” Upwards.
  • Can repair pipes with up to 90% Wall Loss.
  • Suitable for up to 34 Barg pressure.
  • Single-handed Installation
  • 15 Min Installation
   

     
           
 

Split sleeve, composite repair for low-pressure (34 Barg) pipelines with severe corrosion (up to 90% wall loss) defects.

 

18” vertical Snap Wrap installed within 25 minutes.

 

Single handed installation in pipe support location with severe (up to 90%) wall loss.


         
   
         
Multiple units can be placed side-by-side for long corrosion defects.
 
6” repair made on Oxygen line with severe corrosion at ground level.
 
Repair made on same Oxygen line with under-lagging corrosion – no hot work was required.

         
Typical areas of use are:
  • Tank farms
  • Jetties
  • Refineries
  • Process Plants
  • Bridge Crossings
  • Offshore
   
Installation Procedure        
         
 
 
 
                         
 
© SHS Group 2004